VFD
H100+ Quick Guide
To assist user of LSE H100+ AC Drive the following LSE Quick Guide "Start Reference" for drive Commissiong has been created. This Guide is very helpful for the initial programming needs during AC drive commissioning on your project. H100+ Quick Guide ...
What is the H100/H100+ Ground Screw sizes?
See below table for H100 and H100+ ground screw/bolt sizes. Frame Mode Size A Frame LSLV0008H100-2/4 M4xL10 LSLV0015H100-2/4 LSLV0022H100-2/4 LSLV0037H100-2/4 LSLV0055H100-2/4 LSLV0075H100-2/4 LSLV0110H100-2/4 B Frame LSLV0150H100-2/4 M4xL10 ...
S100 Ethernet Option Installation Guide
S100/H100 Conduit Kit Guide
Below is the conduit kit guide for the S100 and the H100. Please note that the M100 does not have a guide.
H100+ Easy Start Procedure
G100 Ethernet IP Setup
After installing the Ethernet IP card on a G100 the below steps should be followed for proper setup and operation. When controlling the VFD over Ethernet. Set... Drv=4 Field Bus Frq=8 Field Bus Setup Network addressing with the below parameters. The ...
G100 Conduit Kits
See attached manual and drawings for the G100 Conduit Kits.
Are the 115V and 230V M100 frame sizes the same?
Yes, they are the same but you will notice that they shift a frame size form the 115VAC to the 230VAC. See below. 230VAC M100 A Frame INV,LSLV0001M100-1EOFNA INV,LSLV0002M100-1EOFNA B Frame INV,LSLV0004M100-1EOFNA INV,LSLV0008M100-1EOFNA C Frame ...
Connecting an S100 VFD to Allen Bradley PLCs over Ethernet
Refer to the attached documents for assistance in setting the S100 to communicate over Ethernet to an AB PLC. S100 Ethernet Module Allen Bradley PLC Setup Guide - Start with this guide to see initial setup steps. EDS File - An importable electronic ...
Option Card Installation on the S100-4X
Option cards such as Ethernet/IP, Extension IO, and other available cards can be installed on the S100-4X. Installation is slightly different than the standard S100 IP20. Only one option card can be installed at a time. Refer to the below ...
Recommended Branch Circuit Protection for VFDs
This document (attached) is a supplement to the user manual, where the manuals do not provide detail in the fuse, CB, and manual motor starter (MMS) sizing. This document shows the exact fuses, circuit breakers, and MMS to use on LS VFDs. Equivalent ...
METASYS-N2 Quick Communications Start
LCD Keypad NEMA 4X Kit
Utilize the attached manual for assistance with installation of the NEMA 4X LCD keypad mount. This door kit can be used with both the S100/iS7 and H100 LCD keypad.
H100 Disconnect Installation
Attached is the installation manual for the H100 disconnect option. Additionally, attached is the dimensional drawings. Refer to the below table for weights. Disconnect Item code Disconnect Description Weight(kg) 64160028 INV,DISCONNECT MODULE ...
G100 Modbus RTU Connection
The G100 offers 2 different connection methods for Modbus RTU. Either S+ and S- on the control IO strip or the RJ-45 connection may be used. See the below diagram for location and pin-outs.
VFDs at High Altitude
LS VFDs installed at an altitude of 1000m above sea level or less do not require a derate. VFDs installed at an altitude between 1000 to 4000m require a derate of 3% for every 300m over 1000m. For calculating the derate, please refer to the attached ...